Motorists traveling between Phoenix and Payson on Monday, Jan. 26 are urged to allow extra travel time as northbound traffic will be restricted as part of a safety improvement project on State Route 87 north of Sunflower from mileposts 223 to 229.
From 2 a.m. through 8 p.m. on Jan. 26, northbound SR 87 traffic will be stopped at the work zone and southbound SR 87 will convert to a two-lane roadway as northbound drivers will be guided through the work zone with a the aid of a pilot car. Delays of up to 30 minutes are possible.
The work, which was originally scheduled for this week, was rescheduled due to material delays.
You must be a member to read this story.
Join our family of readers starting at $5 for your first month and support local, unbiased journalism.
Click here to see your options for becoming a subscriber.
Register to comment
Click here create a free account for posting comments.
Note that free accounts do not include access to premium content on this site.
I am anchor
Beeline work scheduled for Monday
Posted
Motorists traveling between Phoenix and Payson on Monday, Jan. 26 are urged to allow extra travel time as northbound traffic will be restricted as part of a safety improvement project on State Route 87 north of Sunflower from mileposts 223 to 229.
From 2 a.m. through 8 p.m. on Jan. 26, northbound SR 87 traffic will be stopped at the work zone and southbound SR 87 will convert to a two-lane roadway as northbound drivers will be guided through the work zone with a the aid of a pilot car. Delays of up to 30 minutes are possible.
The work, which was originally scheduled for this week, was rescheduled due to material delays.
ADOT advises drivers to allow additional time to reach their destinations and to proceed through the work zone with caution, comply with the reduced speed limit, and be alert for construction equipment and personnel.
Comments
No comments on this item Please log in to comment by clicking here